Citation (Citation #: 2025-00011780)
Citation Number:
2025-00011780
Date Issued:
Fri, Aug 1, 2025 8:56 AM
Status:
Final Order
Total Citation Amount:
$250.00
Name of Person Cited:
THAMES VALLEY PROPERTY LLC
Property in Violation:
2362 THAMES VALLEY WAY LOT 32
BOWLING GREEN KY 42101
PVA Parcel #:
Property Owner:
Code Compliance Officer:
Dara Price
Inspection Date:
Thu, Jul 31, 2025 7:45 AM
Code Violations (2)
Code:
BGKY C21 21.2.03.d Requirement to adhere to the COBG BMP Manual Public Infrastructure, Rights-of-Way and Stormwater / Stormwater Quality / Construction Site Stormwater Management
Code Description:
Requirements for the design, maintenance, and a menu of Best Management Practices (BMPs) are located in the City of Bowling Green Stormwater BMP Manual. Site construction in the City shall comply with the provisions of the BMP Manual. Fallout on fill area in back that needs remediation, basin needs stabilization with as built submitted. Unattended bare soil areas needs stabilization as well. BMP's need to be installed on jobsite until stabilization is achieved. Protective measures needed for fallout areas and trenching for safety.
Code:
BGKY C21 21.2.04.j Failure to properly implement required BMPs Public Infrastructure, Rights-of-Way and Stormwater / Stormwater Quality / Illicit Discharge; Applicability; Responsibility
Code Description:
Requirement to prevent, control and reduce stormwater pollutants by the use of BMPs. The City shall review and approve BMPs for any activity, operation or facility that may cause or contribute to pollution, discharge of hazardous materials or has the potential to contaminate naturally occurring stormwater or waters of the United States. The owner or operator of a commercial or industrial establishment shall provide, at their own expense, reasonable protection from accidental discharge of prohibited materials or other wastes into the MS4 or any conveyance through the use of these structural and non-structural BMPs. Further, any person responsible for a property or premise which is, or may be, the source of an illicit discharge may be required to implement, at such person's expense, additional structural and nonstructural BMPs to prevent the further discharge of pollutants or hazardous materials to the MS4 or any conveyance. These BMPs shall be part of a Stormwater Pollution Prevention Plan (SWPPP) as necessary for compliance with requirements of the NPDES permit. Fallout on fill area in back that needs remediation, basin needs stabilization with as built submitted. Unattended bare soil areas needs stabilization as well. BMP's need to be installed on jobsite until stabilization is achieved. Protective measures needed for fallout areas and trenching for safety.
Let us know if anything is wrong with this page. However, please don't include any personal or financial information.