Citation (Citation #: 2023-00009290.2)

General Information

Citation Number:
2023-00009290.2

Date Issued:
Thu, Sep 14, 2023 1:49 PM

Status:
Paid/Fees Waived

Total Citation Amount:
$1,500.00

Name of Person Cited:
TAIBOS LANDING LLC / NGUYEN TAI

Property in Violation:
6567 NASHVILLE RD
BOWLING GREEN KY 42101
PVA Parcel #: 030A58 001

Property Owner:
TAIBOS LANDING LLC % NGUYEN TAI T
160 SKEES RD
BOWLING GREEN KY 421048751

Code Compliance Officer:
Courtenay Howell

Inspection Date:
Wed, Sep 13, 2023 4:00 PM

Code Violations (3)

EPSC

Code:
BGKY C21 21.2.03.d Requirement to adhere to the COBG BMP Manual Public Infrastructure, Rights-of-Way and Stormwater / Stormwater Quality / Construction Site Stormwater Management

Code Description:
Requirements for the design, maintenance, and a menu of Best Management Practices (BMPs) are located in the City of Bowling Green Stormwater BMP Manual. Site construction in the City shall comply with the provisions of the BMP Manual. Erosion prevention & sediment control measures are not being maintained/implemented. Sediment must be controlled from leaving the lot. Any areas that will not be worked for more than 14 days (basin) must be stabilized. Construction materials and debris are not contained. Trash is not being disposed of properly (cannot be burned or buried). Trackout is occurring at an unapproved ingress/egress as well as the approved construction entrance.

Illicit Discharge

Code:
BGKY C21 21.2.04.a Illicit Discharge; Applicability, Responsibility Public Infrastructure, Rights-of-Way and Stormwater / Stormwater Quality / Illicit Discharge; Applicability; Responsibility

Code Description:
Other than naturally-occurring stormwater, no person shall discharge or cause to be discharged into the MS4, or any conveyance, any materials, including but not limited to pollutants or hazardous materials or waters containing any pollutants or hazardous materials that cause or contribute to a violation of applicable water quality standards. Allowable discharges that create or have the potential to create unsafe conditions on city streets or other public rights-of-way are prohibited. The commencement, conduct or continuance of any illegal discharge to the MS4 or any conveyance is prohibited. Construction materials and debris are not contained and are subsequently mixing into the site soil and blowing onto neighboring properties/ditches.

EPSC

Code:
BGKY C21 21.2.04.j Failure to properly implement required BMPs Public Infrastructure, Rights-of-Way and Stormwater / Stormwater Quality / Illicit Discharge; Applicability; Responsibility

Code Description:
Requirement to prevent, control and reduce stormwater pollutants by the use of BMPs. The City shall review and approve BMPs for any activity, operation or facility that may cause or contribute to pollution, discharge of hazardous materials or has the potential to contaminate naturally occurring stormwater or waters of the United States. The owner or operator of a commercial or industrial establishment shall provide, at their own expense, reasonable protection from accidental discharge of prohibited materials or other wastes into the MS4 or any conveyance through the use of these structural and non-structural BMPs. Further, any person responsible for a property or premise which is, or may be, the source of an illicit discharge may be required to implement, at such person's expense, additional structural and nonstructural BMPs to prevent the further discharge of pollutants or hazardous materials to the MS4 or any conveyance. These BMPs shall be part of a Stormwater Pollution Prevention Plan (SWPPP) as necessary for compliance with requirements of the NPDES permit. Erosion prevention & sediment control measures are not being maintained/implemented. Sediment must be controlled from leaving the lot. Any areas that will not be worked for more than 14 days (basin) must be stabilized. Construction materials and debris are not contained. Trash is not being disposed of properly (cannot be burned or buried). Trackout is occurring at an unapproved ingress/egress as well as the approved construction entrance.

Suggestions or problems with this page?

Let us know if anything is wrong with this page. However, please don't include any personal or financial information.

Would you like a reply?

We'll only use this to reply to your message.